Questions C_TPLM22_67 SAP Project Systems with SAP ERP 6.0 EHP7

Which indicator is set for assemblies that need to be ordered well in advance of consumption and are allocated as stock items? There is 1 correct answer to this question
What are the various options available for creating a WBS BOM? There are 2 correct answers to this question
Which of the following can promptly identify commitments for a project that are too high and trigger various actions in response? There is 1 correct answer to this question
Could a user with Access Control List ( ACL) authorization “Read” lock a project? There is 1 correct answer to this question
Based on which of the following the checking control function determines whether an order type will be checked and if so, which checking rules should be used? There is 1 correct answer to this question
Consider a scenario in easy cost planning where you plan dates and resources in network activities and the system automatically determines the corresponding planned costs as part of network costing In this scenario planned costs are determined for which od the following? There are 3 correct answers to this question
Which scheduling calculates the latest start and finish dates for all activities? There is 1 correct answer to this question
You have implemented activity-based costing to allocate business process overhead costs to your projects Which data in the project is used to find the appropriate business process template? There are 3 correct answers to this question
Which of the following levels can you assign persons to work centers? There are 2 correct answers to this question
In which type of billing the total value to be billed is apportioned to individual dates in the billing plan according to defined rules? There is 1 correct answer to this question
What is the transaction code for editing costing and valuation variants? There is 1 correct answer to this question
Which of the following do you have to create for services to be performed by external resources instead of using externally processed activities? There are 2 correct answers to this question
What are the different options available for project stock? There are 3 correct answers to this question
To link customer inquiry in SD to the project system, you need to assign one or more inquiry items to which of the WBS element? There are 2 correct answers to this question
In which type of project stock G/L account determination for project stock is controlled differently from collective stock using specific valuation classes for sales order stock and project stock in the material master? There are 2 correct answers to this question
Which type of order is created at BOM level to cover requirements when a material shortage occurs in material planning? There is 1 correct answer to this question
In addition to manual planning in the WBS, sometimes assign different types of orders ( internal orders or maintenance orders, for example) to the WBS element that are flagged as account assignment elements. What is the use of this assignment? There are 3 correct answers to this question
Which of the following can be specified in an invest profile? There are 3 correct answers to this question
Which of the views available in structure oriented planned displays the planned costs of appended orders of network activities assigned to the WBS element? There is 1 correct answer to this question
Which of the following prerequisites need to be met in order to analyze the capacity requirements of an activity? There are 3 correct answers to this question
What should you call up to view all the information on an active or completed job that was scheduled in the scheduler in schedule manager? There is 1 correct answer to this question
How are various stock types managed for each material component? There is 1 correct answer to this question
In requirements grouping which indicator must be set for WBS elements that determines whether the requirements may be grouped into one WBS element and how? There is 1 correct answer to this question
What do you choose when creating a new network by copying an operative network? There are 3 correct answers to this question
How do you optimize cash flows to maximize project profits and reduce project costs? There is 1 correct answer to this question
Which account category is used for account assignment of orders, which includes network headers, network activities, maintenance orders, internal orders and manufacturing orders? There is 1 correct answer to this question
What are the different procurement types you can choose between if you choose direct procurement with item category N? There are 2 correct answers to this question
In which type of billing do you assign the posting to the down payment request when you post the incoming payment for a down payment? There is 1 correct answer to this question
In which type of project stock costs from external procurement are posted directly to the stock-keeping WBS element when goods or invoice are received? There is 1 correct answer to this question
When using budgeting and active availability control, which business transactions affect the current budget? There are 3 correct answers to this question
Which of the following cannot be entered when using service activities in networks for planned and unplanned services? There is 1 correct answer to this question
What does “E” determine in account assignment while using consumption posting indicator to determine the controlling object for the sales item? There is 1 correct answer to this question
You are using the bottom-up scheduling scenario for a project containing WBS elements and networks. This means that. There are 2 correct answers to this question
Which type of confirmation allows you to confirm various networks, activities, activity elements, and individual capacities at the same time? There is 1 correct answer to this question
Assume you have information on sources of supply, quantities, and prices and you have decided to use unit costing to produce a cost plan per WBS element Which of the following costs can be planned? There are 3 correct answers to this question
Which of the following allows you to view project objects with key performance data for a quick analysis and update the percentage complete for earned value calculation? There is 1 correct answer to this question
Which functions allows you to make cross-project changes to fields pertaining to project definitions, WBS elements, networks, activities, milestones and relationships? There is 1 correct answer to this question
How are cost-relevant items determined for stock materials while using planned costs in networks? There is 1 correct answer to this question
Which statements about Project coding mask are true? There are 3 correct answers to this question
How do you create a detailed payment schedule if the expense for an external activity or purchased component is not paid with a single invoice? There is 1 correct answer to this question
Among the various functions provided by progress tracking that simplify data entry and analysis which function allows you to go the master data display for objects that are underlined? There is 1 correct answer to this question
Your customer wants to use milestone billing. Billing elements are implemented. What do you have to do in addition to enable milestone billing? There are 2 correct answers to this question
Most of the reports in the SAP Project System can be refreshed without existing or closing the report. Which report must be restarted to update the displayed data? There is 1 correct answer to his question
Based on which of the following; reservation or purchase requisitions can automatically be created for a project? There are 2 correct answers to this question
Can you specify in the application which status profile should be used the first time you set a user status where profile has not yet been defined in the project profile? There is 1 correct answer to this question
Which of the following cost planning transactions are related to account assignment? There are 3 correct answers to this question
Which function of budgeting allows you transfer any funds not used up in the previous fiscal year to the budget of the new fiscal year? There is 1 correct answer to this question
Which of the following items can be included in the planned costs for an activity besides the cost of the activity? There are 3 correct answers to this question
You have created a network with successive activities. After scheduling the network, the Gantt chart shows that every activity has the same earliest start and earliest finish date as the network header What could be the reason? There is 1 correct answer to this question
You área using the billing and down payment processing in Sales and Distribution and updating the actual data to billing elements in the project system Which of the following business processes can be mapped in Sales and Distribution? There are 3 correct answers to this question
Which of the following costs are automatically calculated based on the resource requirements identified for activities and operations when using networks and activities? There is 1 correct answer to this question
Which of the following documents the processing status of activities and activity elements in a network and enables you to make forecast as to how the project will progress? There are 1 correct answer to this question
How can material components be assigned to network activities? There are 3 correct answers to this question
How can the capacity requirements of an activity be reduced? There are 3 correct answers to this question
What are the two basic elements that SAP Project System provides for mapping the structures of projects? There are 2 correct answers to this question
Which indicator of the event scenario specifies whether the time interval can be changed manually in the application or not? There is 1 correct answer to this question
How do you derive the hierarchy of a work breakdown structure from the numbers of their WBS elements? There is 1 correct answer to this question
Which parameters determine if the network header or network activities are cost objects? There are 2 correct answers to this question
Which of the following are used when you use the SAP document management system in project system to assign document info records? There are 2 correct answers to this question
In which of the following is the capacity planning indicator set? There is 1 correct answer to this question
If the available user-definable fields do not satisfy your requirement, you have an option to develop additional fields for which of the following. There are 2 correct answers to this question
Which combination allows you to assign the material components in one WBS element to different grouping WBS element? There are 2 correct answers to this question
Which version type of project cost planning allows you to maintain without an existing operative project and can later transfer simulation versions to an existing or new project? There is 1 correct answer to this question
If the material is not assigned to any sales order or project and are available for use by general plant requirements. We consider this under which type of stock? There are 2 correct answers to this question
What do you call a closed sequence of relationships and activities where you start from an activity and end up back at the same activity by way of relationships? There is 1 correct answer to this question
Which type of confirmation allows you to enter the actual start and finish date, forecast finish date and forecast work in a tabular format? There is 1 correct answer to this question
Which transaction along with suitable selection criteria allows you to specify which networks and sub networks are to be taken into account as part of overall network scheduling? There is 1 correct answer to this question
You want to confirm working hours to a WBS element using Cross Application Time Sheet ( CATS). However, once you enter the WBS element and the working hours in CATS you receive an error message. What could be the reason? There is 1 correct answer to this question
Which of the following are controlled using plant and order type parameters? There are 2 correct answers to this question
You cannot use CATS to enter confirmations for production orders because confirmations in production primarily handle which of the following? There are 2 correct answers to this question
What do you call the documents where the purchased material is delivered directly from the vendor to the customer? There is 1 correct answer to this question
What tis the transaction code for editing the planning profile? There is 1 correct answer to this question
With reference to material requirements in Project System (PS-MAT). Which of the following statements are true? There is 1 correct answer to this question
In resource-related billing if you do not want to bill a customer for a dynamic item, where do you enter this information? There is 1 correct answer to this question
Which of the following ensures that a claim arising from variances is prepared and lodged against the contractual partners at the right time or deflected if it is in the other direction? There is 1 correct answer to this question
Which type of activity allows you to draw up service specifications and enter value limits for any unplanned services? There is 1 correct answer to this question
Which of the following combination of assignment to an externally-processed activity allows you to carry out capacity planning for your vendors? There is 1 correct answer to this question
Which manual cost planning method is used in WBS? There are 3 correct answers to this question
In progress tracking what are the different ways of assigning the dates of events that are assigned to network components while evaluation? There are 3 correct answers to this question
In which of the following’s levels can you execute BOM transfer in the order browser? There are 3 correct answers to this question
Which of the following helps you to adjust cost planning to changing circumstances during the execution phase of the project? There is 1 correct answer to this question
When you assign material components using the BOM transfer function, the system uses the Reference Point field in the BOM items and activities to establish a logical connection between which items? There are 2 correct answers to this question
In general the costs of internally processed activities and general cost activities can be distributed as required over the network duration and this distribution is controlled using a distribution key that can be stored in the activity How are costs distributed if a distribution key is not maintained in the activity for internally processed activities? There is 1 correct answer to this question
How do you evaluate and display details of orders and networks that create capacity requirements at the work centers? There is 1 correct answer to this question
What are the components on which reporting is based upon, in profit center accounting? There are 2 correct answers to this question
Which type of billing is generally used in plant engineering and construction projects? There is 1 correct answer to this question
Which of the following parameters are used to set the appended and apportioned indicators? There are 3 correct answers to this question
Which business functions from the following are supported by network activities? There are 3 correct answers to this question
Project system has its own Organization structure, which can be a matrix structure; There is 1 correct answer to this question
Your projects consists of WBS elements, several networks, and subnetworks. What are the advantages of new overall network scheduling (CN24N) instead of the old overall network scheduling (CN24)? There are 3 correct answers to this question
What tis the starting point for milestone billing? There is 1 correct answer to this question
Which types of networks store all the activity and material component costs at the network header level and behave in the same way as all other order categories? There is 1 correct answer to this question
How can you distinguish between service activities and external activities while accessing the detailed information for service activities on the external tab page? There are 2 correct answers to this question
In bottom-up time scheduling scenario the differences between the earliest and latest dates of an activity are referred to as? There is 1 correct answer to this question
What are the three areas of the project screen? There are 3 correct answers to this question
If a component and the upper-level activity have different delivery information. Which of the following has priority for the component?
When the system derives settlement rules, it generates profitability segments that contain the characteristic values of which of the following assigned to them? There are 2 correct answers to this question
Which type of down-payment chain allows you to monitor receivables to customers and to gain information on past and future incoming payments? There is 1 correct answer to this question
In structure Information System which transactions allow you to analyze and edit the entire hierarchical structure of a project including documents, PS texts, networks, other orders, investment programs, and SD documents? There are 2 correct answers to this question
With reference to Organization Assignments in Project Systems, which of the following statements are true? There are 2 correct answers to this question
In which check does only receipts that are booked before a requirement (issue) are included in the check for this issue? There 1 correct answer to this question
How does a Project manager plan resources in projects and define responsibilities for different objects? There are 2 correct answers to this question
Which of the following type determines which type of orders a system can create during assembly processing? There is 1 correct answer to this question
The determination of the settlement profile and result analysis key is based on WBS-operative indicators for which of the following? There are 2 correct answers to this question
Which of the following can be used to calculate and update interest in SAP project system? There are 2 correct answers to this question
What do you use in the parameters for network type to specify whether a workflow is to be generated in the case of purchase order relevant change? There is 1 correct answer to this question
You have created a network with planned work for internal activities. In a capacity planning report, you discover that no capacity requirements were determined What are the possible reasons for this? There are 2 correct answers to this question
Which of the following determines the item category assigned in the sales documents? There are 2 correct answers to this question
Assume a scenario where deviations from the project plan occurred as a result of delivery problems, price fluctuations, and unforeseeable capacity bottlenecks How do you ensure that claims resulting from deviations are prepared for contractual partners and submitted to them ate suitable point of time? There is 1 correct answer to this question
Assume a scenario Where in, during the planning phase you entered basic dates for WBS elements, for instance by creating graphical time bars in the project planning board and as a result in the execution phase you have an option to set the actual dates in the sameway in the project planning board What is the status that must be ser before you can enter actual start and actual end dates? There are 2 correct answers to this question
How do you reduce the scheduled duration of internally-processed activities if the time period within which the activities are to be scheduled is not long enough to process all activities? There is 1 correct answer to this question
Which of the following determines the account assignment category in sales order item? There are 2 correct answers to this question
In which transactions can you specify whether networks are scheduled together with maintenance orders that have been assigned as sub networks? There are 2 correct answers to this question
Which type of view related to resource-billing allows you to change conditions for individual items of the billing request? There is 1 correct answer to this question
Which indicator do you use to define the characteristics of a WBS element and to specify tasks are performed by the WBS element when the project is executed? There is 1 correct answer to this question
Assume you have created a sales order for material to which strategy group for assembly processing has been assigned and the system automatically created a so-called assembly order in the background and started assembly processing In this case, the assembly processing omits which stage and generates an operative order directly from the sales order? There is 1 correct answer to this question
Items procured through which of the following methods are not assigned to a stock segment and do not pass through a warehouse? There is 1 correct answer to this question
Which of the following postings are possible if you are using execution services to enter commitment and actual costs for items that you planned using Easy Cost Planning? There are 3 correct answers to this question
What are the prerequisites for scheduling the standard events of a scenario? There are 3 correct answers to this question
A customer wants to maintain basic data and dates of a WBS element on the same tab. Also, basic start and basic finish should be mandatory fields. What do you recommend? There are 2 correct answers to this question
Which technique is one of the ways to measure the earned value where each milestone corresponds to a percentage of work completed in an activity or a WBS element in progress analysis? There is 1 correct answer to this question
Workforce Planning in Project System, allows you to assign certain HR resources to activities of a project. Which of the following can be assigned? There are 3 correct answers to this question
How can you determine the degree of control yourself if you are managing material in plant stock or according to individual WBS element where you have no control over procurement or fully responsible for procurement? There is 1 correct answer to this question
Which variant defines the valuation procedure for materials, internal activities, external activities, and business processes? There is 1 correct answer to this question
What are the different types of assembly orders that can be created? There are 3 correct answers to this question
In which type of procurement the goods receipt for non-stock components is posted as an expense and is not posted to inventory accounts and the account assignment object is debited with the costs of procured materials? There is 1 correct answer to this question
In which type of settlement, the costs of all the periods up to the one you specify in settlement are settled? There is 1 correct answer to this question
Which version serves as a proof of the project status in the past and also serves as a comparison with the operative project? There is 1 correct answer to this question
In which of the following transactions the profile for WBS scheduling is used for scheduling in the project planning board? There are 2 correct answers to this question
Which indicator determines whether summarization is executed on the basis of classification or master data characteristics in a network profile? There is 1 correct answer to this question
What are the three tables that are defined for order type in network costing? There are 3 correct answers to this question
You have implemented automatic requirements grouping for projects. Once you check the materials turbine and fittings you realize that the requirements are grouped for turbine but not for fittings. What might be the reason? There is 1 correct answer to this question
You want to extrapolate basic dates from lower to higher-level WBS elements. Which planning method do you choose? There is 1 correct answer to this question
All the currency-dependent data in the Project System is managed in three different currencies in parallel. There are 3 correct answers to this question
Which of the following information regarding cost activity is not relevant for the calculation of planned costs? There is 1 correct answer to this question
Which type of view in budgeting helps you to check the distribution of the budget over fiscal years? There is 1 correct answer to this question
In your Project, you choose internal activities to confirm actual dates. After you partially confirmed an internal activity, you want that the actual start will be considered for the calculation of the earliest scheduled dates How can you implement this? There is 1 correct answer to this question
Where else should you make manual changes, if you assign bill of materials (BOM) items to a network activity manually by exploding the BOM and then changed the BOM? There is 1 correct answer to this question
Which method of revenue planning allows you to follow the same procedure as in hierarchical cost planning or can be entered by revenue element? There is 1 correct answer to this question
What tis the procurement element for requirements planning? There is 1 correct answer to this question
Which activity type in resource planning enables you to define service specifications and value limits for unplanned services rendered by the service provider? There is 1 correct answer to this question
Which of the following related to an activity stipulates the activity type and determines how an activity is handled during calculation, scheduling and capacity planning? There is 1 correct answer to this question
You work with Project Builder (CJ20N) and want to use standard templates in your project structure. Which standard templates can you use? There is 1 correct answer to this question
Which costing supplies strategic information that can be used to reduce overheads and increase profitability by highlighting unprofitable products or customers? There is 1 correct answer to this question
Which indicator automates the grouping of project stocks assigned to individual WBS elements to the top WBS element? There is 1 correct answer to this question
Wha tis the flag used for WBS elements for which you want to plan costs? There is 1 correct answer to this question
Which item category do you choose if you do not want to include the components in inventory management but want to use them immediately in the network? There is 1 correct answer to this question
Which of the following can be derived automatically when you carry out scheduling in projects with networks? There are 2 correct answers to this question
Which SAP standard item category always leads to direct procurement and purchase requisition generated by the network? There is 1 correct answer to this question
What happens if the appended indicator is not set and an order is appended? There is 1 correct answer to this question
Which of the following scenario doesn’t allow the plan value of the order to be added to the committed value of the WBS element until the order has the status released? There is 1 correct answer to this question
Which account assignment category is important for non-valuated project stock with WBS and sales order item? There is correct answer to this question
Which of the following statements concerning requirements grouping are correct? There are 3 correct answers to this question
What are the prerequisites for automatic requirements grouping on the top WBS element of a project? There are 2 correct answers to this question
Which of the following determines the available output of labor and machines within a certain time period? There are 2 correct answers to this question
Externally processed activities give rise to planned costs that are equivalent to the prices of the following? There are 2 correct answers to this question
When you assign a work center to a network internal activity the work center provides which of the following functions? There are 3 correct answers to this question
Which function controls the business transactions that are permitted or forbidden for a WBS element? There is 1 correct answer to this question
In internal processing which views allow you to easily and quickly assign persons to activities and use various data ( availability of the person from human resources, the total work planned for that person, or the activity date)? There are 2 correct answers to this question
Which of the following decides whether networks can be header assigned or activity-assigned? There are 2 correct answers to this question
What are the various transactions in SAP PS with which a work breakdown structure can be created? There are 3 correct answers to this question
Consider a scenario Where you have started by displaying the planned costs for the entire project and how these planned costs are distributed among the various value categories for WBS elements WBS 2 You then want to analyze the planned costs of a WBS element WBS 2 for value category 620 according to cost distribution to the various periods Which type of reporting allows you to achieve this? There is 1 correct answer to this question
How do you effectively control your project and estimate the POC of WBS elements, activities and activity elements? There is 1 correct answer to this question
Can the user status forbid business transactions that the systems status allows? There is 1 correct answer to this question
What is copied when transferring a simulation version back to an operative project? There are 3 correct answers to this question
Which of the following rules do you use to specify the proportion of costs that should be settled to receivers while maintaining settlement rule for WBS element or networks and activities in a overview screen? There is 1 correct answer to this question
Which of the following specifies how much time must elapse between individual archiving steps in network type? There is 1 correct answer to this question
In which of the following ways Open PS allows you to exchange data directly with MS project? There are 3 correct answers to this question
Which type of network does not allow you to assign material directly, but only indirectly using a bill of material? There is 1 correct answer to this question
What are the pre-requisites for distributing work to HR resources? There are 2 correct answers to this question
Which type of reports allows you to choose the objects whose costs you want to analyze or call up an appropriate list and choose the period you want to evaluate? There is 1 correct answer to this question
Which functions allows you to check consistency of the dates within the project structure with or without taking activities into account? There is 1 correct answer to this question
While customizing the progress tracking profile which indicators specifies whether the respective dates are to be scheduled? There is 1 correct answer to this question
When using network and activities, planned costs are automatically calculated based on resource requirements identified for which of the following? There are 2 correct answers to this question