Início » C_TS422_2020 S/4HANA Production Planning and Manufacturing

C_TS422_2020 S/4HANA Production Planning and Manufacturing

C_TS422_2020

Questions C_TS422_2020 SAP S/4HANA Production Planning and Manufacturing

What does the material type influence? Note: There are 2 correct answers to this question.
How can you achieve a feasible production plan in case of capacity constraints? Note: There are 3 correct answers to this question.
You have maintained the parameters for simple discontinuation in the material master of a component. Which business process will be affected if the available stock is zero and the discontinuation date is in the past?
For which categories can you define BOMs in SAP S/4HANA? Note: There are 2 correct answers to this question.
What are the consequences if the Dispatched operation status is set for a production order operation? Note: There are 2 correct answers to this question.
How can SAP S/4HANA support a GMP-compliant production process? Note: There are 3 correct answers to this question.
Which time elements are part of a routing operation? Note: There are 3 correct answers to this question.
Which information is required when you create a product master in SAP S/4HANA? Note: There are 2 correct answers to this question.
You set up a material as a phantom assembly by entering the special procurement key in the material master. How can you switch off the phantom assembly in a specific bill of material (BOM)?
If the stock level drops below the reorder stock in reorder point planning, what logic would the system use to trigger procurement?
When working with both cross-plant and plant-specific material statuses in the material master, which status has the highest priority?
You have a scheduling agreement with a vendor. You want classic MRP to automatically create schedule lines in case of material shortage. What must you do? Note: There are 2 correct answers to this question.
How can you carry out cost object controlling for production orders? Note: There are 2 correct answers to this question
Which SAP applications can be used for forecasting in Supply Chain Planning? Note: There are 2 correct answers to this question.
What determines whether the planned independent requirements in MRP are consumed by other requirements?
Your client is asking for your advice on material master numbering in SAP S/4HANA. What do you need to consider? Note: There are 2 correct answers to this question.
Advanced Planning uses master data and transaction data from SAP S/4HANA. In which data objects can you set the Advanced Planning flag? Note: There are 2 correct answers to this question.
During production order creation, several valid production versions are found. How does the system choose the production version?
Your project uses process orders for the production of liquid chemicals. What can you define to ensure that the production flow happens only in physically connected tanks?
What does a line hierarchy in repetitive manufacturing represent?
Which alternative item strategies are available in bills of material (BOM) in SAP S/4HANA? Note: There are 2 correct answers to this question.
How would you define pegging in the context of Advanced Planning?
Which SAP solutions support the supplier area in the portfolio of the digital value network? Note: There are 3 correct answers to this question.
Where do you maintain the work center that represents the production line for repetitive manufacturing? Note: There are 2 correct answers to this question.
How can you limit the validity of a bill of material (BOM)? Note: There are 2 correct answers to this question.
In your plant, MRP is activated. Which options do you have to exclude a material from the MRP run? Note: There are 2 correct answers to this question.
Which options do you have to plan both quantities and capacities during line loading in repetitive manufacturing? Note: There are 2 correct answers to this question.
Which of the following questions do you have to answer before you start creating a BOM? Note: There are 2 correct answers to this question.
Your project team decides to use a make-to-order planning strategy for a strategic material in discrete manufacturing. What is the impact of this decision? Note: There are 3 correct answers to this question.
You want to insert an operation at a certain time on a work center. The planning direction is forward. The desired dispatching time coincides with an operation that has previously been dispatched. How does the insertion take place?
What do you use to dispatch operations from planned orders so that the production plan can be fulfilled?
For a production version to be valid and consistent, what requirements must be fulfilled? Note: There are 3 correct answers to this question.
You want to schedule an operation finitely, without moving other operations. Which scheduling strategy do you select?
Mode selection is one of the scheduling options available in Advanced Planning in SAP S/4HANA. When can you use mode selection?
What is the purpose of collective orders?
In your project, you have several materials that are planned by different people. How can you assign the planning responsibility?
What are some uses for the low-level code assigned to each material? Note: There are 2 correct answers to this question.
When can the automatic material availability check occur in a production order? Note: There are 2 correct answers to this question.
What type of time element can be reduced by strategy settings while dispatching? Note: There are 2 correct answers to this question.
Which of the following processes lead to an entry in the MRP planning file? Note: There are 3 correct answers to this question.
Which time elements does MRP consider in backward scheduling to determine the order dates for components from dependent requirements? Note: There are 2 correct answers to this question.
You want to create a production order from a planned order. What methods could you use? Note: There are 2 correct answers to this question.
Your production planners must execute planning only for specific resources. How can you achieve this in Advanced Planning (PP/DS)?
When do you use variant bills of material (BOMs)?
Which of the following is a valid sequence of the main activities in production order processing? Note: There are 2 correct answers to this question.
What is a work center hierarchy in capacity planning in SAP S/4HANA?
Which master data object governs the relationship between supply source and demand source in the Kanban process?
Which of the following are possible configuration steps when setting up the alert monitor in Advanced Planning? Note: There are 2 correct answers to this question.
Which of the following elements does MRP take into account during net requirement calculation? Note: There are 2 correct answers to this question.
What are the possible results of a production planning run in Advanced Planning (PP/DS)? Note: There are 3 correct answers to this question.
What does forecasting in the demand planning cycle include? Note: There are 3 correct answers to this question.
The MRP run detected a shortage of a material that you source from an external supplier in full pallets. How can you make sure you will only receive full pallets?
You want to reduce planning efforts for B/C materials. Which planning procedure do you recommend?
You need to model goods receipt processing time in detailed scheduling. Which modeling options do you have? Note: There are 2 correct answers to this question.
What are the consequences when you assign a planned order to a production line manually, using the planning table in repetitive manufacturing?
For what production type are production orders used?
An issue storage location was NOT found through the work center, bill of material (BOM) item, or material master. What determines whether the storage location can be derived from the production version?
Where do you maintain data to determine the duration of an operation for production? Note: There are 2 correct answers to this question.
Your quality department detects a deviation in a raw material batch. Unfortunately, this batch has already been used in production. How can you identify all affected finished goods stocks?
You are working with planning strategy 40 (Planning-with-final assembly). When does consumption of planned independent requirements take place?
Which materials have a negative quantity in a bill of material or in a recipe? Note: There are 3 correct answers to this question.
How can you set up the supply source for the Kanban process in SAP S/4HANA? Note: There are 3 correct answers to this question
What does it mean for the production planner when MRP schedules with infinite capacities?
Which business processes are affected by settings in the order type- dependent parameters? Note: There are 2 correct answers to this question.
Which time elements are relevant for lead time scheduling of a production order? Note: There are 2 correct answers to this question.
What happens to dependent requirements of a planned order when you convert the planned order into a production order?
Which actions does the system perform by default when you save a confirmation for a finished product in repetitive manufacturing? Note: There are 3 correct answers to this question.
In the Schedule Production app, which settings can you make for the planning strategy? Note: There are 3 correct answers to this question.
Which chart types does the tabular planning table provide in SAP S/4HANA? Note: There are 2 correct answers to this question.
You want to set up a make-to-order planning scenario for a finished material. The bill of material contains two components: one should be procured for each sales order individually, the other one should be procured jointly for all independent requirements. Forecasting for the finished product is NOT possible. Which settings do you make to achieve this?
Which methods are available for goods issue posting of material components for process orders? Note: There are 2 correct answers to this question.
Your company produces a finished good based on a forecast and expects it to be in stock when customers order it. If customers order more than the forecasted quantity, the production quantity should be increased to try to meet the extra demand. Which planning strategy do you use?
What could be the reason for multiple commitment of individual capacities, where several operations have the same scheduled dates on a work center (or resource) after capacity planning? Note: There are 2 correct answers to this question.
You want to trigger in-house production of a semi-finished material before a sales order for the corresponding finished good is received. Which planning strategy supports the consumption of planned independent requirements for the semi-finished material?
What is the purpose of a reporting point confirmation in repetitive manufacturing? Note: There are 2 correct answers to this question.
Why would you use phantom assemblies? Note: There are 3 correct answers to this question
What is the difference between co-products and by-products?
You want to use capacity availability checks for production orders. Which settings have to be made for this? Note: There are 2 correct answers to this question.
You use planning strategy Finite Scheduling – with Reverse and want to allow scheduling in the past. How can you achieve this?
Which item statuses can you select inside a material BOM? Note: There are 2 correct answers to this question