SAP TCodes Production Planning
- B3MG Display Master Warranty
- BGM1 Create Master Warranty
- BGM2 Change Master Warranty
- BM00 SAP Easy Access Batch Management
- BMBC Batch Information Cockpit
- C201 Create Master Recipe
- C202 Change Master Recipe
- C203 Display Master Recipe
- C223 Production Version: Mass Processing
- C251 Master Recipe Print List
- C252 Print List for Production Versions with Consistency Check
- C260 Task List Changes
- C261 Display Change Documents for a Recipe Group
- C298 Deletion of Task Lists without Archiving
- CA00 SAP Easy Access Routings
- CA01 Create Routing
- CA02 Change Routing
- CA03 Display Routing
- CA10 Stdandard Text
- CA11 Create Reference Operation Set
- CA12 Change Reference Operation Set
- CA13 Display Reference Operation Set
- CA21 Create Rate Routing
- CA22 Change Rate Routing
- CA23 Display Rate Routing
- CA31 Create Reference Rate Routing
- CA32 Change Reference Rate Routing
- CA33 Display Reference Rate Routing
- CA60 Task List Changes
- CA62 Display Change Documents for Reference Operation Set Group
- CA63 Display Change Documents for a Routing
- CA64 Display Change Documents for a Reference Rate Routing Group
- CA70 Use of PRT in Task Lists: Selection
- CA75 Replace PRT in Task Lists: Selection
- CA75N Mass Change of Production Res./Tools: Selection
- CA80 Work Center Where-Used: Selection
- CA81 Resource Where-Used: Selection
- CA85 Replace Work Center: Selection
- CA85N Mass Change Work Center
- CA87 Replace Work Center: Selection
- CA90 Use of Reference Operation Set in Task Lists: Selection
- CA95 Replace Reference Operation Set: Selection
- CA95N Mass Change Ref. Operation Set Reference: Selection
- CA96 Update Material Master
- CA97 Update Material Master: Initial Screen (for Mass Processing)
- CA98 Deletion of Task Lists without Archiving
- CA99 Archive Administration
- CAC0 SAP Easy Access Master Recipe – Access Via Production Version
- CC00 SAP Easy Access Engineering Change Management
- CC01 Create Change Master
- CC02 Change Change Master
- CC03 Display Change Master
- CC04 Product Structure Browser
- CC05 Change Overview Initial Screen
- CC07 Change Number Selection
- CK11N Create Material Cost Estimate with Quantity Structure
- CK13N Display Material Cost Estimate with Quantity Structure
- CK24 Price Update: Mark Standard Price
- CK31 Print log of costing run
- CK33 Comparison of Itemizations
- CK40N Edit Costing Run
- CK41 Create Costing Run (Material)
- CK42 Change Costing Run (Material)
- CK43 Display Costing Run (Material)
- CK44 Delete Costing Run
- CK80 Cost Component Report for Product Cost Estimate
- CK81 Application Tree Report Selection Product Cost Planning
- CK82 List of Existing Material Cost Estimates
- CK83 Call RKKBPCD0 in Background
- CK84 Line items in cost est for product
- CK85 Line Item Report Costing Items
- CK86 Costed Multilevel BOM, Material Cost Estimate
- CK87 Costed Multilevel BOM, Sales Order Cost Estimate
- CK88 Partner Cost Component Split
- CK89 Cost Component Report for Sales Document Cost Estimate
- CK90 SAP Easy Access: Mixed Costing
- CK91 Create Procurement Alternative
- CK91N Display Procurement Alternatives
- CK92 Change Procurement Alternatives
- CK93 Display Procurement Alternatives
- CK94 Change Mixing Ratios
- CK95 Display Mixing Ratios
- CKC1 Check Costing Variant
- CKCM Easy Cost Planning: Model
- CKECP Ad Hoc Cost Estimate
- CKM3 Material Price Analysis
- CKMB Display Material Ledger Document
- CKME Release Planned Price Changes
- CKMF Allow Price Determination
- CKMG Allow Closing Entries
- CKMH Single-Level Material Price Determination
- CKR1 Reorganization of Cost Estimates
- CKUC Multilevel Unit Costing
- CKW1 Create Cost Estimate for Production Lot
- CKW3 Display Cost Estimate for Production Lot
- CKW4 Activate Cost Estimate for Production Lot
- CM00 SAP Easy Access Capacity Planning
- CM01 Capacity Planning: Selection (Work Center – Load)
- CM02 Capacity Planning: Selection (Orders)
- CM03 Capacity Planning: Selection (Work Center – Pool)
- CM04 Capacity Planning: Selection (Work Center – Backlog)
- CM05 Capacity Planning: Selection (Work Center – Overload)
- CM07 Capacity Planning (Variable)
- CM22 Capacity leveling: SFC planning table
- CM23 Capacity leveling: SFC orders tab
- CM24 Capacity Leveling (Individual Capacity – Tabular)
- CM25 Capacity Leveling (Variable)
- CM26 Capacity leveling: Proj. View Tabular
- CM27 Capacity level.: SFC indiv. cap. graph
- CM28 Capac. level.: SFC indiv. cap. Tab
- CM30 Capacity Leveling (Indvidual Capacity – Graphical)
- CM31 Cap. leveling: SFC orders graphical
- CM32 Cap. leveling: PS graph
- CM33 Capacity Leveling (Work Center – Graphical)
- CM34 Capacity Leveling (Work Center – Tabular)
- CM35 Capacity Leveling (Resource View – Table)
- CM36 Capacity Leveling (Process Order View)
- CM38 Capacity Planning (Capacity Leveling Long-Term Planning)
- CM50 Capacity level: SFC work cntr list
- CM51 Cap. level: SFC individual cap. list
- CM52 Cap. leveling: SFC orders list
- CM53 Capacity leveling: PS elem/version
- CM54 Capacity leveling: PS list via vers.
- CM55 Cap. leveling: PS list WCntr/version
- CM56 Capacity evaluation (Resource View)
- CM57 Capacity evaluation (Order View)
- CMP2 Workforce Planning – Selection Project View
- CMP3 Workforce Planning: Selection for Work Center View
- CMP9 Workforce Planning – Reporting
- CO00 SAP Easy Access Shop Floor Control
- CO01 Production Order Create
- CO01S Simulation Order Create
- CO02 Production Order Change
- CO02S Simulation Order Change
- CO03 Production Order Display
- CO03S Simulation Order Display
- CO04 Print Shop Papers
- CO04N Print Production Orders
- CO05N Release Production Orders
- CO06 Backorder Processing
- CO07 Production Order Create (Without Material)
- CO08 Production Order Create (For Sales Order)
- CO09 Availability Overview
- CO10 Production Order Create
- CO11 Enter Production Order Confirmation
- CO11N Enter time ticket for production order
- CO12 Collective Entry: Time Ticket
- CO13 Cancel Production Order Confirmation
- CO14 Display Production Order Confirmation
- CO15 Enter Production Order Confirmation
- CO16N Postprocessing Incorrect Confirmations
- CO27 Picking List
- CO40 Production Order Create (Planned Order)
- CO41 Collective Conversion of Planned Orders
- CO43 Actual Overhead Calculation: Production/Process Orders
- CO44 Mass Processing for Orders
- CO46 Order Progress Report: Selection Screen
- CO48 Production Order Create
- CO78 Archiving of Production Orders
- CO88 Actual Settlement: Production/Process Orders
- COB1 Create Batch Search Strategy
- COB2 Change Batch Search Strategy
- COB3 Display Batch Search Strategy
- COFC Reprocessing of confirmations with errors in calc. of actual costs
- COHV Mass Processing Production Orders
- COID Selection of Indiv. Object Lists
- COIO Order Info System for PP-PI
- COMAC Collective Availability Check
- COOIS Production Order Information System
- COPD Print Process Order
- COPI Print Process Order Shop Floor Papers
- COR1 Create Process Order
- COR2 Change Process Order
- COR3 Display Process Order
- COR5 Release Process Order
- COR6 Create Process Order Confirmation
- COR6N Enter time ticket for process order
- COR7 Create Process Order (Convert Planned Order)
- COR8 Collective Conversion of Planned Orders
- CORA Process Order: Scheduling External Relationships
- CORK Enter Process Order Confirmation
- CORO Create Process Order w/o Material
- CORR Collective Entry of Confirmations
- CORS Cancel Process Order Confirmation
- CORT Display Process Order Confirmation
- CORZ Enter Confirmation of Process Order: Create Time Event
- CR01 Create Work Center
- CR02 Change Work Center
- CR03 Display Work Center
- CR05 Work Center List
- CR06 Assignment of Work Centers to Cost Centers
- CR07 Work Center Capacities
- CR08 Work Center Hierarchy
- CR09 Standard Text
- CR10 Work Center Change Documents
- CR11 Create Capacity
- CR12 Change Capacity
- CR13 Display Capacity
- CR15 Capacity: Where-used
- CR21 Create Hierarchy
- CR22 Change Hierarchy
- CR23 Display Hierarchy
- CR60 Work center information system
- CRA1 Archive Administration: Create Archive Files
- CRA2 Archive Administration: Execute Delete Program
- CRAA Display Work Center
- CRAH Create Work Center
- CRAV Change Work Center
- CS00 SAP Easy Access Bills of Material
- CS01 Create Material BOM
- CS02 Change Material BOM
- CS03 Display Material BOM
- CS05 Change BOM Group
- CS06 Display BOM Group
- CS07 Create Plant Assignment
- CS08 Change Plant Assignment
- CS09 Display Plant Assignment
- CS11 Explode BOM: Level by Level
- CS12 Explode BOM: Multi-Level BOM
- CS13 Explode BOM: Summarized BOM
- CS14 BOM Comparison: Initial Screen (One-Level)
- CS15 Where-Used List: Material: Initial Screen
- CS20 Mass Changes: Material Selection (Bills of Material)
- CS21 Mass Changes: Material Selection
- CS22 Mass Changes: Document Selection
- CS23 Mass Changes: Class Selection
- CS25 Archive Administration: Create Archive Files
- CS26 Archive Administration: Execute Delete Program
- CS27 Archive Administration: Run Read Program
- CS28 Archive Administration: Initial Screen
- CS31 Create class BOM
- CS32 Change class BOM
- CS33 Display class BOM
- CS40 Create Link to Configurable Material
- CS41 Change Link to Configurable Material
- CS42 Display Link to Configurable Material
- CS51 Create standard BOM
- CS52 Change standard BOM
- CS53 Display standard BOM
- CS61 Create order BOM
- CS62 Change order BOM
- CS63 Display order BOM
- CS71 Create WBS BOM
- CS72 Change WBS BOM
- CS73 Display WBS BOM
- CS74 Create WBS BOM (Structure)
- CS75 Change WBS BOM (Structure)
- CS76 Display WBS BOM (Structure)
- CS80 Display Change Documents: Material BOM
- CS81 Display Change Documents: Standard BOM
- CS82 Display Change Documents: Order BOM
- CS83 Display Change Documents: WBS BOM
- CS84 Change documents for class BOM
- CS90 Number ranges for material bills of material
- CS91 Standard object list number range
- CS92 Number ranges for sales order BOMs
- CSK1 Explode BOM: Level by Level
- CSK2 Explode BOM: Multi-Level BOM
- CSK3 Explode BOM: Summarized BOM
- CSMB Material BOM Browser
- CSPB WBS BOM
- CV15 Change Document BOM group
- CV16 Display Document BOM group
- IK01 Create Measuring Point
- IK01R Create Reference Measuring Point
- IK02 Change Measuring Point
- IK02R Change Reference Measuring Point
- IK03 Display Measuring Point
- IK03R Display Reference Measuring Point
- IK06 Display Measuring Points for Object
- IK07 Display Measuring Points: MeasPoint Selection
- IK07R Display Reference Measuring Point: Reference Measuring Point Selection
- IK08 Change Measuring Points: MeasPoint Selection
- IK08R Change Reference Measuring Point: Reference Measuring Point Selection
- IPMD “Display View “”Maintain Permits””: Overview”
- KSOP Transfer Scheduled from PP for Business Processes
- KSPP Transfer Planned Activity Requirements for Production
- LDB1 Create Line Hierarchy
- LDB2 Change Line Hierarchy
- LDB3 Display Line Hierarchy
- MB11 Enter Goods Movement
- MB31 Goods Receipt for Order (Production)
- MBVR Manage Reservations
- MC11 Create Evaluation
- MC12 Change Evaluation
- MC13 Display Evaluation
- MC35 Create Rough-Cut Planning Profile
- MC36 Change Rough-Cut Planning Profile
- MC37 Display Rough-Cut Planning Profile
- MC61 Create Planning Hierarchy
- MC62 Change Planning Hierarchy
- MC63 Display Planning Hierarchy
- MC64 Create Event
- MC65 Change Event
- MC66 Display Event
- MC67 Planning Hierarchy Graphic
- MC71 Product group hierarchy
- MC72 Product Group Usage
- MC74 Transfer Planning Data to Demand Management (Material)
- MC75 Transfer Planning Data to Demand Management (Product Group)
- MC78 Copy Planning Version
- MC80 Delete Planning Version
- MC84 Create Product Group
- MC85 Display Product Group
- MC86 Change Product Group
- MC88 Sales and Operations Planning
- MC8A Planning Type: Create
- MC8B Planning Type: Change
- MC8C Planning Type: Display
- MC8D Create Planning Job
- MC8E Change Planning Job
- MC8G Schedule Background Run for Selected Planning Objects
- MC8J List of planning objects
- MC8V Copy Planning Version
- MC8W Delete Planning Version
- MC90 Transfer Planning Data to Demand Management
- MC93 Create Plan in Flexible Planning
- MC94 Change Plan in Flexible Planning
- MC95 Display Plan in Flexible Planning
- MC96 “Change View “”Configuration of Forecast Profiles””: Details”
- MC9B Determine Proporations of Lowest-Level Nodes for Consistent Planning
- MC9C Standard Analysis for Info Structure
- MC9K Maintain Available Capacity for Material
- MCI6 Object Statistics
- MCP1 Operation Analysis
- MCP3 Production Order Analysis
- MCP5 Material Analysis
- MCP7 Work Center Analysis: Selection
- MCRE Material Usage Analysis
- MCRI Product Costs Analysis
- MCRX Material Usage Analysis
- MCRY Product Costs Analysis
- MCYJ Shop Floor Information System (PP-IS): Execute Exception Analysis
- MD01 MRP Run
- MD02 Single-Item; Multi-Level (MRP)
- MD03 Single-Item, Single-Level (MRP)
- MD05 MRP List (Individual Display)
- MD06 MRP List (Collective Display)
- MD07 Stock/Requirements List (collective Display)
- MD09 Determine Pegged Requirements
- MD11 Create Planned Order
- MD12 Change Planned Order
- MD13 Display Planned Order
- MD14 Convert Planned Order to Purchase Requisition
- MD15 Collective Conversion of Plnd Ord. to Pur. Req.
- MD16 Display Planned Orders
- MD17 Collective Requirements Display
- MD20 Create Planning File Entry
- MD21 Display planning file entries
- MD25 Create Planning Calendar
- MD26 Change Planning Calendar
- MD27 Display Planning Calendar
- MD43 Single-Item Planning – Interactive
- MD44 Evaluation of the Planning Situation
- MD45 Evaluation of the Planning Result
- MD46 Evaluation of the Planning Result for MRP Controller
- MD47 Evaluation of Product Group Planning
- MD48 Cross-Plant Evaluation
- MD4C Multilevel Order Report
- MD50 Make-To-Order Planning – Multi-Level
- MD51 Project Planning – Multi-Level
- MD61 Create Planned Independent Requirements
- MD62 Change Planned Independent Requirements
- MD63 Display Planned Independent Requirements
- MD64 Standard Independent Requirements (Create)
- MD65 Change Standard Independent Requirements
- MD66 Display Standard Independent Requirements
- MD73 Display Total Requirements
- MD74 Reorganizing Indep. Reqmts – Adjusting Requirements (PlndIndReq)
- MD75 Indep. requirements reorganization – Delete old requirements records
- MD76 Reorg: Indep. Reqmts – Delete History and Independent Requirements
- MD79 PP Demand Management / XXL List Viewer
- MD81 Create Independent Requirements
- MD82 Change Independent Requirements
- MD83 Display Independent Requirements
- MDAB Set up planning file entries: Variant
- MDAC Execute Action for Planned Order
- MDBT Total Planning: Variants
- MDL1 Create Production Lot
- MDL2 Change Production Lot
- MDL3 Display Production Lot
- MDLD Print MRP List
- MDRE Plnning file entries consisten: Variants
- MDSA Display BOM Explosion Numbers
- MDSP Maintain BOM Explosion Numbers
- MDUM Convert Planned Orders into PR: Variants
- MDUP Process project assignment
- MDUS Display project assignment
- MDVP Collective Availability Check
- MF12 Display Document Log Information
- MF26 Display Reporting Point Information
- MF30 Creation of Preliminary Cost Estimates for Product Cost Collectors
- MF41 Document-Specific Backflush Reversal
- MF42N Collective Entry of Confirmations
- MF45 Postprocess Backflush Items
- MF46 Collective Postprocessing
- MF50 Planning Table Initial Screen: Change Mode
- MF51 Production List for Repetitive Manufacturing
- MF52 Planning Table Initial Screen: Display Mode
- MF57 Planning Table Initial Screen: By MRP Lists
- MF60 Material Staging for Planned Orders
- MF63 Staging Situation for Planned Orders
- MF65 Picking: Collective processing
- MF68 Message logs for material staging
- MF70 Aggregate Collective Backflush
- MFBF REM Confirmation: Transaction Variant: None
- MFHU HU Backflush in Repetitive Manufacturing
- MP30 Execute Forecast (Materials)
- MP31 Change Forecast (Materials)
- MP32 Display Forecast (Materials)
- MP33 Forecast Reprocessing
- MP38 Execute Mass Forecast
- MP39 Material Forecast Printing
- MP80 Forecast Profile Create
- MP81 Forecast Profile Change
- MP82 Forecast Profile Delete
- MP83 Forecast Profile Display
- MP90 Number Ranges for Forecast Parameter
- MP91 Number Ranges for Forecast Values
- MPBT Total Forecast: Variants
- MPDR Print forecast: Variants
- MS31 Create Planning Scenario
- MS32 Change Planning Scenario
- MS33 Display Planning Scenario
- MS44 Long-Term Planning: Evaluation
- MS64 Copy Version
- MSC1N Create Batch
- MSC2N Change Batch
- MSC3N Display Batch
- MSC4N Display Change Documents for Batch
- OMI8 Plant Parameters for Material Requirements Planning
- OP4A “Change View “”Grouping””: Overview”
- OPPP “Change View “”Alternative BOM Determination””: Overview”
- OS29 “Change View “”User Profile for BOMs””: Overview”
- PK00 SAP Easy Access Kanban
- PK01 Create Control Cycle
- PK02 Change Control Cycle
- PK03 Display Control Cycle
- PK03NR Display Control Cycle
- PK05 “Change View “”Supply Area””: Overview”
- PK05S Fast Entry Supply Area
- PK06 “Display View “”Supply Area””: Overview”
- PK10 Define Status of Kanban Board
- PK11 Kanban Plant Overview
- PK12N Kanban Board: Supply Source Overview
- PK13N Kanban Board: Demand Source Overview
- PK17 Collective Kanban Print
- PK18 Econtrol Cycle and Kanban Evaluation
- PK21 Kanban Signal
- PK22 Quantity Signal: Input
- PK23 Create Kanban
- PK41 Kanban Backflush
- PK50 Kanban Processing: Error Display
- PKBC Kanban Signal
- PKC1 SAP Easy Access Activity-Based Costing Information System
- PKMC Control Cycle Maintenance: Display
- WWP1 Planning Workbench (Online Planning)
- WWP3 Planning Workbench (Order Cancellation)